Process Architecture Updated September 26, 2026
Choosing an ARIS Alternative
ARIS is the deeper repository; ProcessMind is the smaller product with the features that decide the work. Compare them in one matrix.
An ARIS alternative is usually not a search for more software, but a search for less of it. ARIS has been the deeper repository for decades; ProcessMind is the smaller product built around the features that decide whether process work actually happens this quarter.
So this page does the thing a vendor page usually avoids: it publishes the feature matrix, gives ARIS the rows it wins, and argues for the rows that matter to a modern process team.
ARIS has more features than we do, and we are not going to pretend otherwise. What we built is the smaller product, with the features that decide whether process work finishes: mine a process, model it, simulate the change and publish the result in one workspace, without an implementation project.
ARIS and ProcessMind compared: the feature matrix
The matrix below gives ARIS three clear rows, ProcessMind five, and one that is a genuine split.
| Dimension | ARIS | ProcessMind | Edge |
|---|---|---|---|
| Enterprise architecture | ArchiMate-class architecture, application and technology layers, in one repository | Process architecture, hierarchy and owners; stops before application and technology layers | ARIS |
| Notation | BPMN, EPC, ArchiMate-class and other model types | BPMN 2.0 and value stream mapping | Split |
| Repository scale | Built for architecture practices with very large model catalogs and long-established conventions | Built for the processes a team actually maintains | ARIS |
| Ecosystem and skills | A large, teachable skills base built up over decades | Fewer specialists needed, because there is less to configure | ARIS |
| Time to first result | Contact-driven onboarding, usually inside an implementation project | Self-service signup; first process map the same day | ProcessMind |
| How it is built | A suite of modules licensed and operated as one product family | One workspace built as one piece on one process definition | ProcessMind |
| Simulation | Available in the wider platform | What-if on the same model, and from the model alone when there is no event log | ProcessMind |
| User experience | Enterprise-focused, with training and configuration expected | Browser-based, no-code, built for analysts and process owners | ProcessMind |
| Pricing | Not published; quoted per engagement | Published per-seat tiers, month to month (see the prices) | ProcessMind |
ARIS cells are based on its public material (aris.com, accessed 2026-09-26). The ProcessMind column describes our own product.
ARIS wins the three rows about pure depth, and those three matter most if you run an architecture practice. ProcessMind wins the five that decide whether a process question gets answered, modeled and tested this quarter. Notation is the one genuine split: ARIS covers more model types, ProcessMind covers BPMN 2.0 and value stream mapping. A smaller feature set is still the better product when it holds the features the work needs.
So the useful question is not which tool has more rows. It is which rows your team actually uses. Read the matrix as a shopping list: if you are looking for an ARIS software alternative, the rows you use are the requirement and the rest is weight. And if all you need is an ARIS BPM alternative for modeling alone, a focused modeler may be enough.
Why teams look for an ARIS alternative
Four changes tend to start the review, and only one of them is about price.
Pricing transparency. ARIS does not publish list prices. Its pricing page leads to a demo or a contact request, which is normal for enterprise software but makes early budgeting harder. ProcessMind publishes three per-seat tiers on the pricing page. The difference is transparency, not a claim that we are cheaper: you can see our numbers against your own seat count, and ARIS will quote for yours.
The ownership change. SAG Aris GmbH now sells ARIS at aris.com, after its separation from Software AG. The former Software AG ARIS URLs no longer resolve, and the community continues at ariscommunity.com. If you are searching for a Software AG ARIS alternative because of it, use it as a prompt to check model formats, export options and who supports the capabilities your team depends on.
The size of the suite. ARIS grew over decades into an enormous suite: its own method, its own notation, modules for mining, governance and architecture, and a repository model that rewards specialists. Nothing about that is broken, and where you use the depth it earns its place. But scale has a running cost in configuration, training, conventions and upgrades. If your team needs to document, measure and improve a handful of processes, you are paying for scale you do not use. The alternative to ARIS in that case is not a smaller feature list, it is a smaller surface to run.
Models and process data in one place. A model says how work should run; an event log says how it did run. To compare the two, modeling and mining need to share a workspace instead of passing files between modules.
Where ARIS still wins
ARIS is not a weak product, it is a very large one, and three of its strengths are hard to argue with.
- ArchiMate-class architecture. Application, technology and business layers in one repository. ProcessMind does not offer that, and we are not going to pretend to.
- Repository governance at scale. Conventions, versioning and publishing refined over decades for practices with thousands of models.
- An established skills base. ARIS expertise is common and teachable, supported by decades of training material.
Notation is the split. ARIS covers more model types, including EPC and ArchiMate-class. ProcessMind covers BPMN 2.0 and value stream mapping, so a value stream and the models beneath it stay one artifact. If you need EPC, that is ARIS. If you need a value stream drawn over the models you already have, that is us.
If those three strengths are the center of your work, staying on ARIS is the right call, and a smaller feature set does not change that.
One workspace instead of a suite
ProcessMind’s main advantage is architectural rather than cosmetic: it was built as one piece.
ARIS is assembled from modules that are licensed, operated and often implemented as parts of one product family. In ProcessMind, process mining, BPMN 2.0 modeling, value stream mapping, simulation, dashboards and AI assistance all read the same process definition.
The difference shows up in the loop you repeat every week. In a suite, a model is exported or synced before it can be analyzed, and an analysis is re-keyed before it can be modeled. In one workspace, the mined process is the process you edit, the model is what the simulation runs, and the value stream is drawn over the same BPMN models instead of being kept in step by hand. An ARIS process mining alternative has to close that gap, or it adds another place to look.
One workspace also means one place to invite people, one permission model and one place documents live. Work instructions and SOPs sit on the activity they describe as an artifact, rather than in a document store next to the model. AI assistance works on the same definitions: describe a process in plain language and generate a first BPMN draft, or summarize a mined process without exporting anything.
It still stops before ArchiMate, application portfolios and technology layers. That is the row ARIS wins, and it is a real one. If you need an ARIS process architecture alternative with that depth, the requirement should decide the evaluation.
Simulation: test the change before you build it
Simulation changes how a decision gets made, not just how a diagram looks.
In most toolchains a process change is argued in a meeting and then discovered in production. Simulation runs the change first: you alter a step, add a role or shift capacity and see the effect on cycle time and throughput while it is still a scenario.
You do not need event data to start. If you have a model but no log, ProcessMind can suggest parameters from the BPMN structure and generate a virtual event log, so a proposed change can still be tested before it is implemented. When you do have a log, the same engine uses measured times and compares the scenario with what actually happens.
Be careful with the first case. A model without data is an assumption made visible, and the simulation documentation is explicit about that. Label it that way. It is still a better basis for a decision than a diagram and an opinion.
Pricing you can check without a call
We publish our prices and sell month to month. Most ARIS competitors quote per engagement instead.
ProcessMind has three per-seat tiers: Foundation at €29, Architecture at €99 and Intelligence at €299 per seat per month. Billing is monthly by default, with an annual discount available, and every paid seat includes ten free viewer seats. A 14-day free trial runs on your own data before you decide.
There is no implementation quote and no minimum term to negotiate. You sign up, invite the people who work in the platform and change seats as the work changes. That is what self-service means here: not that the product is simple, but that the commercial step does not need a project.
None of this is a claim that ProcessMind costs less than ARIS. The contracts are not comparable and we do not have ARIS quotes. What is comparable is how the decision gets made: you can see our numbers beside your seat count today, and ARIS will quote for yours. Compare total cost of ownership, including data preparation and the internal time needed to run the platform, not license price alone.
How do you migrate from ARIS to ProcessMind?
Migration is the part of this page that has to stay honest: the routine answer that it is easy is not true.
The common ground is BPMN 2.0. If your ARIS license allows a BPMN 2.0 XML export, those models keep their notation and layout when you import them. ProcessMind imports BPMN 2.0 XML, either a single file or a zip of several, and the import and export documentation lists the supported cases.
EPC and ArchiMate-class content does not import. Those relationships usually have to be rebuilt, either redrawn in BPMN 2.0 or modeled in the process architecture when they are about processes and owners rather than applications.
Documents travel separately. Work instructions, SOPs, spreadsheets, PDFs and screen captures can be attached to an activity as an artifact, so the explanation sits with the step it describes instead of in a folder nobody opens.
AI helps with the models that do not export. Describe the process in plain language and generate a first BPMN draft, then have the people who run the process correct it. That is often faster than rebuilding an old model element by element, and it produces a model someone has agreed to.
-
Export one value stream as BPMN 2.0 XML
Start with the process that matters most rather than the whole catalog, and check the export format before you promise anything. -
Import and check what survives
Open the model in ProcessMind and check notation, layout, attributes and any links to other elements. Record what transferred and what did not. -
Rebuild what did not export
Redraw it, or generate a draft with AI and correct it together with the people who run the process. EPC and ArchiMate content is usually rebuilt rather than converted. -
Attach the documents to the activities
Move work instructions and SOPs onto the steps they describe as artifacts, so they travel with the model. -
Name an owner and set a review date
A model without an owner drifts. Decide who keeps it current and when it gets reviewed.
Even done well, this is a project, and the reason to do it is rarely the migration itself. It is the moment to decide which models are actually maintained, who owns them and which can be retired. If a model has had no owner for two years, moving it only moves the problem.
So scope the work on one value stream, keep the rest of the catalog as read-only reference, and move processes when they come up for review. For what a catalog of models costs to keep alive, see our notes on process governance.
Which should you choose?
The matrix points one way for process teams and the other way for architecture practices.
Stay on ARIS
- Your architecture practice depends on ArchiMate, application or technology layers
- Repository governance at scale is the point of the platform
- You have the skills, the budget and the appetite for an enterprise suite
ARIS is the deeper architecture repository, and this is the case where that wins.
Move to ProcessMind
- You need mining, modeling, simulation and value streams in one workspace
- You want to test a change before implementing it, with or without event data
- You want published prices, month-to-month terms and a self-service start
A smaller feature set, with the features a process team needs to finish the work.
The recommendation leans to ProcessMind for process teams, because the rows it wins are the ones standing between a question and a tested change. It leans to ARIS for architecture practices, because depth is not something we can substitute with enthusiasm.
A third answer is common and worth saying: keep ARIS for the architecture repository and run ProcessMind for the process work that needs measurement and simulation. The two do not have to be exclusive, and one process is enough to test the division. If you are comparing architecture tools more broadly than ARIS, see enterprise architecture tools.
Where to Go From Here
You can test the migration on one real model, check the architecture capability, or compare us with the process-intelligence platforms as well.